A condominium board has to make structural decisions on behalf of many owners, with a budget, a reserve study, and a duty to document. We scope and report with that responsibility in mind.

In brief

  • About 27 percent of Solana Beach housing units are in buildings of five or more units, and another 20 percent are single-family attached.
  • About half of all housing units in Solana Beach were built in the 1970s, according to Census estimates.
  • We provide structural evaluation, written scopes, engineer coordination, and repair, and we write findings a board can forward to owners.

Free Quote

Why associations are a focus

Census estimates for Solana Beach show a housing stock that is nearly half attached or multifamily. Of 6,624 units, 26.7 percent are in buildings of five or more units and 19.6 percent are single-family attached. The same estimates place about half of all housing units in the 1970s. An association whose buildings date from that decade is managing structures around fifty years old, in a marine environment, and those buildings may include elevated decks, exterior stairs, and garage structures.

Associations need something different from a single-family owner. The decision is collective, the budget is shared, and the board is accountable to owners for how it reached its conclusion.

What we provide to boards

Condition assessment. A structured walk-through of foundations, slabs, garage levels, exterior walls, stairs, and decks, with a crack plan, elevation readings where relevant, and photographs.

Written findings. Plain-language descriptions, a significance rating for each condition, and recommended next steps. We write for a reader who is not an engineer.

Prioritized scope. Items separated into immediate, near-term, and monitor categories, to support reserve planning and phasing decisions.

Engineer coordination. Many association repairs require a structural engineer’s design. We coordinate with licensed engineers as needed and can work alongside an engineer the association has already retained.

Owner communication support. Summaries suitable for distribution, and availability to walk the property with the board or manager.

Construction and closeout. Repair to the approved scope, with photographs and completion records for the association’s files.

Common conditions in Solana Beach buildings

  • Spalling concrete and corroded reinforcing at balconies, stair landings, walkways, and foundation edges. See concrete spalling and salt air.
  • Slab cracking and settlement at building perimeters and garage slabs. See slab foundation repair.
  • Drainage deficiencies that direct water toward foundations or, on bluff-top properties, toward the bluff. See foundation drainage.
  • Retaining walls at driveways and grade changes. See retaining wall repair.
  • Seismic considerations in older multi-unit buildings, including those with parking at the ground level. See seismic retrofit.

SB 326 and elevated elements

California Civil Code §5551, enacted through SB 326, requires condominium associations with three or more units to have exterior elevated elements, such as balconies and walkways, inspected by qualified professionals on a recurring schedule, with the first inspection due by January 1, 2025. The statute sets out who may perform those inspections and what they must cover. Associations should confirm their obligations and cycle with counsel or their manager.

Our role is related but distinct. When a statutory inspection identifies repairs, or when a board wants a broader structural picture that includes foundations and slabs, we can scope and perform the repair work, coordinated with the engineer of record.

Bluff-top associations

Some associations own bluff-top buildings with drilled piers, upper-bluff walls, or seawalls. A 2024 City Council staff report concerning one such property described an engineer’s finding that existing seawall tiebacks had “little to no retention capacity” after testing. The example illustrates why aging bluff systems warrant periodic engineering review. We build and repair these systems to engineered plans. See seawall and upper-bluff system repair.

Permits

Structural repairs typically require a building permit. Because the Coastal Commission handles coastal development permits, waivers, and exemptions for the entire city, association projects that qualify as development may involve Commission review. We identify the likely path during scoping. See Coastal Commission permits.

Questions from owners and boards

Can you present findings at a board meeting?

Yes. We can attend to walk through findings and answer questions from directors.

Our reserve study flags “structural repairs, to be determined.” Can you help define them?

Yes. A condition assessment can turn a general line item into defined scope items that a reserve specialist can use.

Does SB 326 cover foundations?

The statute addresses exterior elevated elements. Which components a given inspection covers is a question for the association’s inspector and counsel. A broader structural review can run alongside it when the board wants one.

Can we phase repairs across budget years?

Often, yes. Our prioritized scope is designed to support phasing where conditions allow.

Request a Free Quote

Tell us the association name or building type, number of units, and what prompted the request. For cost considerations, see what affects foundation repair cost.

Free Quote

Request a Free Quote

Tell us what you're seeing at your Solana Beach home. We'll follow up to arrange a visit.

Free Quote